CONSTRUCT BUDDY
Takeoff Report
393 ELEMENTS
Project: Oakwood Commerce Center Date: February 24, 2026 Disciplines: 6 Address: 1200 Commerce Pkwy, Orlando FL
Sheets: 24 pages analyzed Processing: 47 seconds Report ID: CB-20260224-a7f3
This takeoff is generated by AI-assisted plan analysis by Construct Buddy (Textstone Labs, LLC). All quantities should be field-verified before finalizing your bid. AI suggests, you confirm.
Demo Mode — This is a sample takeoff showing what your output looks like. In production, upload your bid plans and get this report in under a minute.
393
Total Elements
6
Disciplines
24
Sheets Analyzed
47s
Processing Time
2
Discrepancies
3
Compliance Flags

Quantity Takeoff

Element counts detected across all sheets, organized by CSI MasterFormat division. Types and specs pulled from door/window/fixture schedules via OCR.

CSI Code Element Spec / Type Qty Unit Sheets Schedule Ref
Division 08 — Openings (Doors & Windows by type from schedule)
08 11 13 Hollow Metal Door & Frame 3'-0" x 7'-0", 18 ga, 90-min fire-rated, closer + panic hardware 22 EA A-101, A-102 Door Schedule D-101 thru D-122
08 11 13 Hollow Metal Door & Frame 3'-0" x 7'-0", 18 ga, 20-min rated, lever hardware 34 EA A-101, A-102, A-103 Door Schedule D-123 thru D-156
08 11 13 Hollow Metal Double Door & Frame 6'-0" x 7'-0" pair, 18 ga, 90-min fire-rated, panic hardware both leaves 8 PR A-101, A-102 Door Schedule D-157 thru D-164
08 14 16 Flush Wood Door & Frame 3'-0" x 6'-8", solid core, stain grade, lever hardware 42 EA A-101, A-102, A-103 Door Schedule D-165 thru D-206
08 14 16 Flush Wood Door & Frame 2'-8" x 6'-8", solid core, paint grade, lever hardware 14 EA A-102, A-103 Door Schedule D-207 thru D-220
08 36 13 Sectional Overhead Door 10'-0" x 10'-0", insulated steel, motor operator 4 EA A-101 Door Schedule D-221 thru D-224
08 41 13 Aluminum Storefront Entrance 3'-6" x 7'-0" single w/ transom, clear anodized, ADA compliant 6 EA A-101 Door Schedule D-225 thru D-230
08 51 13 Aluminum Fixed Window 4'-0" x 5'-0", clear anodized, 1" insulated glass, Low-E 32 EA A-101, A-102, A-103, A-104 Window Schedule W-01 thru W-32
08 52 13 Aluminum Double Hung Window 3'-0" x 4'-6", clear anodized, 1" insulated glass, Low-E 28 EA A-101, A-102, A-103 Window Schedule W-33 thru W-60
08 53 13 Aluminum Awning Window 2'-6" x 2'-4", clear anodized, insulated, for restrooms 12 EA A-102, A-103 Window Schedule W-61 thru W-72
08 44 13 Aluminum Curtain Wall 12'-0" x 10'-0" sections, clear anodized, 1" insulated, Low-E 3 EA A-101 Window Schedule CW-01 thru CW-03
08 62 00 Unit Skylight 2'-0" x 4'-0", self-flashing, tempered/laminated glass 8 EA A-104 (Roof) Window Schedule SK-01 thru SK-08
Division 06 — Wood, Plastics & Composites
06 41 00 Architectural Casework Base cabinets, 34-1/2" AFF, plastic laminate, per room layout 86 LF A-101, A-102 Casework Schedule
06 61 00 Solid Surface Countertop Corian or equal, 25-1/2" deep, 4" backsplash 86 LF A-101, A-102 Casework Schedule
Division 14 — Conveying Equipment
14 24 00 Hydraulic Elevator 2-stop, 2500 lb capacity, cab finish per spec 1 EA A-101, S-101 Elevator spec section
06 51 13 Interior Stair (open tread) 12 risers @ 7", 42" wide, steel stringer w/ wood treads, metal railing 4 FLT A-101, A-102, S-101 Stair details 1/S-201
06 51 13 Enclosed Egress Stair 12 risers @ 7", 44" wide, concrete-filled metal pan, rated enclosure 2 FLT A-101, A-102 Stair details 2/S-201
Division 21 — Fire Suppression
21 13 13 Sprinkler Head — Pendant 1/2" NPT, K5.6, 155°F, chrome finish, standard coverage (15' max spacing) 112 EA FP-101, FP-102, FP-103 Fire Protection Schedule
21 13 13 Sprinkler Head — Upright 1/2" NPT, K5.6, 155°F, brass, mechanical room/storage areas 8 EA FP-101 Fire Protection Schedule
21 13 13 Sprinkler Head — Sidewall 1/2" NPT, K5.6, 155°F, white, corridor/low-ceiling areas 14 EA FP-102 Fire Protection Schedule
21 13 16 Fire Dept. Connection (FDC) 4" Siamese, chrome, wall-mounted, "AUTO SPRINKLER" signage 1 EA FP-101 FP general notes
10 44 16 Fire Extinguisher, Semi-Recessed Cabinet 10 lb ABC dry chemical, 4A:80B:C rated, SS trim, 48" AFF to top 6 EA FP-101, FP-102 Life Safety Plan
Division 22 — Plumbing (Fixtures by type from fixture schedule)
22 42 13 Water Closet — Floor-Mount 1.28 GPF, elongated bowl, ADA height (17-19"), flush valve 8 EA P-101, P-102 Fixture Schedule P-1 thru P-8
22 42 13 Water Closet — Wall-Hung 1.28 GPF, elongated, carrier required, flush valve, ADA 4 EA P-101 Fixture Schedule P-9 thru P-12
22 42 16 Lavatory — Wall-Hung 20" x 18", vitreous china, ADA compliant, single-hole faucet, P-trap 6 EA P-101, P-102 Fixture Schedule L-1 thru L-6
22 42 16 Lavatory — Countertop 19" round, self-rimming, vitreous china, 4" spread faucet 4 EA P-101 Fixture Schedule L-7 thru L-10
22 42 43 Break Room Sink 22" x 25" single bowl, stainless steel, 8" center faucet w/ gooseneck 3 EA P-101 Fixture Schedule S-1 thru S-3
22 42 43 Mop/Service Sink 24" x 24" floor-mount, molded stone, rim guard, wall faucet w/ vacuum breaker 2 EA P-101 Fixture Schedule MS-1, MS-2
22 41 13 Electric Water Heater 50 gal, 4500W, 240V,?"F min recovery, T&P valve + expansion tank 2 EA P-101 Mechanical Schedule
22 13 16 Floor Drain 4" no-hub, cast iron body, adjustable strainer, trap primer connection 6 EA P-101, P-102 Plumbing floor plan
22 14 13 Hose Bib 3/4" MIP, frost-proof, anti-siphon vacuum breaker 4 EA P-101 Plumbing site plan
Division 23 — HVAC (Equipment, distribution & controls)
23 81 26 Split-System Heat Pump — Condensing Unit 5-ton, 14 SEER, R-410A, 208/230V-1ph, on roof curb 4 EA M-101, M-102 Mech Schedule RTU-1 thru RTU-4
23 73 13 Air Handling Unit (indoor) 2000 CFM, DX cooling coil, electric heat, MERV-13 filter, 208/230V 4 EA M-101 Mech Schedule AHU-1 thru AHU-4
23 31 13 Metal Ductwork — Supply Galvanized sheet metal, rectangular, sizes per duct schedule, insulated R-6 680 LF M-101, M-102 Duct size schedule
23 31 13 Metal Ductwork — Return Galvanized sheet metal, rectangular, sizes per schedule, uninsulated 420 LF M-101, M-102 Duct size schedule
23 37 13 Supply Air Diffuser 24" x 24" 4-way, steel, white finish, w/ opposed blade damper 36 EA M-101, M-102 Diffuser schedule SD-1 thru SD-36
23 37 13 Supply Air Diffuser 12" x 12" 2-way, steel, white finish, for small rooms 14 EA M-101, M-102 Diffuser schedule SD-37 thru SD-50
23 37 16 Return Air Grille 24" x 12", steel, white, filter-back type 18 EA M-101, M-102 Diffuser schedule RG-1 thru RG-18
23 37 16 Exhaust Grille 12" x 12", aluminum, for restrooms, w/ fire damper at rated walls 8 EA M-102 Exhaust schedule EG-1 thru EG-8
23 34 00 HVAC Fire Damper Fusible link, 1-1/2 hr rated, at all rated wall/floor penetrations 12 EA M-101, M-102 Mech general notes
23 09 23 Thermostat — Programmable 7-day, 2-stage heat/cool, 24V, per zone (one per AHU) 4 EA M-101 Controls schedule
23 34 23 Exhaust Fan — Inline 150 CFM, 120V, for restrooms, timer-controlled 4 EA M-102 Exhaust fan schedule EF-1 thru EF-4
Division 26 — Electrical (Devices, fixtures & panels by type)
26 27 26 Duplex Receptacle — Standard 20A, 125V, spec grade, ivory, w/ nylon plate 24 EA E-101, E-102, E-103 Electrical floor plans
26 27 26 Duplex Receptacle — GFCI 20A, 125V, tamper-resistant, for wet locations (restrooms, break rooms, exterior) 10 EA E-101, E-102 Electrical floor plans
26 27 26 Dedicated Receptacle — 30A/250V NEMA 6-30R, for HVAC equipment disconnect 4 EA E-101 Power plan / panel schedule
26 51 13 Recessed LED Troffer (2x4) 40W, 4000K, 5000 lumen, prismatic lens, 0-10V dimming 36 EA E-103, E-104 Lighting Schedule Type A
26 51 13 Recessed LED Downlight (6") 15W, 3000K, 1100 lumen, white trim, IC-rated 18 EA E-103, E-104 Lighting Schedule Type B
26 56 13 LED Wall Pack (exterior) 30W, 5000K, photocell, bronze finish, wet-rated 6 EA E-104 Lighting Schedule Type E
26 55 33 LED Exit Sign w/ Battery Red letters, self-powered 90-min battery, combo w/ emergency heads 8 EA E-103, E-104 Life Safety / Lighting Type X
26 05 26 Light Switch — Single Pole 20A, spec grade, ivory, w/ nylon plate 18 EA E-103, E-104 Electrical floor plans
26 05 26 Light Switch — 3-Way 20A, spec grade, ivory, for corridor/stairwell control 8 EA E-103, E-104 Electrical floor plans
26 09 23 Occupancy Sensor Ceiling-mount, dual-tech (PIR + ultrasonic), for conference/restroom 6 EA E-103 Lighting control plan
26 24 16 Panelboard — 225A 208/120V, 3ph, 42-circuit, main lug, NEMA 1 enclosure 2 EA E-101 Panel Schedule "LP-1", "LP-2"
26 24 16 Panelboard — 100A 208/120V, 1ph, 24-circuit, main breaker, NEMA 1 2 EA E-101 Panel Schedule "LP-3", "LP-4"
Division 28 — Electronic Safety & Security
28 31 46 Fire Alarm Pull Station Single-action, addressable, red, 48" AFF, at each exit 5 EA FP-101, FP-102 FA riser diagram
28 31 43 Smoke Detector — Photoelectric Ceiling-mount, addressable, 30' spacing, w/ base and sounder 16 EA FP-101, FP-102, FP-103 FA device layout
28 31 43 Duct Smoke Detector In-duct photoelectric, for AHU supply/return, w/ sampling tube 4 EA FP-101 FA riser / HVAC coord
28 31 49 Horn/Strobe — Wall Mount Addressable, red, 15/75 cd, ADA compliant 10 EA FP-101, FP-102 FA device layout
28 31 11 Fire Alarm Control Panel Addressable, 2-loop, w/ annunciator at main entrance 1 EA FP-101 FA riser diagram
Total Elements Detected 393 across 24 sheets, 6 disciplines

Schedule vs. Drawing Check

Mismatches between detected elements and schedule documents. These could become RFIs.

Status Element Issue Location
MISMATCH Hollow Metal Doors (08 11 13) 64 HM doors detected on A-sheets, but door schedule lists 61 HM doors. 3 doors on A-102 near stair 2 not in schedule — may be addendum items or drafting error. Sheet A-102 (Level 2 east wing) — doors near grid D/7
MISMATCH Sprinkler Heads (21 13 13) 134 heads detected, schedule calls for 128. 6 extra heads on FP-102 open office area. May indicate designer added coverage but didn't update schedule. Sheet FP-102 — open office north zone
WARNING Door D-157 (08 11 13) Schedule says 90-min fire-rated pair, but detail 3/A-108 shows 20-min labeled assembly. Fire rating discrepancy — likely RFI. Sheet A-108 detail vs. door schedule row D-157
WARNING Supply Diffusers (23 37 13) 50 diffusers detected, schedule shows 50, but 3 on M-102 appear to be 12"x12" in rooms calling for 24"x24" per diffuser schedule. Size mismatch. Sheet M-102 — conference rooms 201, 203, 205
MATCH Windows (08 51/52/53) 83 windows detected across all types: 32 fixed + 28 double hung + 12 awning + 3 curtain wall + 8 skylights. All match window schedule counts and types. All architectural sheets
MATCH Plumbing Fixtures (22 42) 39 fixtures detected: 12 WC + 10 lavs + 5 sinks + 6 floor drains + 4 hose bibs + 2 water heaters. All match fixture schedule. Sheets P-101, P-102
MATCH Panelboards (26 24 16) 4 panels detected (2x 225A, 2x 100A). Matches panel schedule. Circuit counts verified against one-line diagram. Sheet E-101

Compliance Pre-Check 3 flags Click to expand

Quick code compliance scan based on detected elements. This is a pre-check, not a substitute for official plan review.

Status Check Detail
FLAG Egress Width (IBC 1005.1) Corridor on Sheet A-3 measures 38" — minimum is 44". Will likely get kicked back by the building dept.
CHECK Sprinkler Coverage (NFPA 13) 18' gap between sprinkler heads on Sheet FP-2 open office. Max spacing is 15'. May need additional heads.
CHECK ADA Clearances (ADA 604) Accessible stall on Sheet P-2 shows 54" side clearance — 60" required. Verify before permit.
PASS Number of Exits (IBC 1006.2) 284 occupants, 4 exits provided. Minimum 3 required — passes.
PASS ADA Ramp Slope (IBC 1012.2) Entry ramp at 1:14 slope with handrails — within 1:12 max.

Generate Sub Bid from takeoff data Click to expand

Auto-generated bid template from your takeoff quantities. Fill in your unit prices and submit to the GC.

Division 26 — Electrical Sub Bid Template — auto-populated from takeoff
CSI Item & Spec Qty Unit Unit Price Extended
26 27 26 Duplex Receptacle, 20A/125V, spec grade, ivory 24 EA $___ $___
26 27 26 GFCI Receptacle, 20A/125V, tamper-resistant (wet locations) 10 EA $___ $___
26 27 26 Dedicated Receptacle, 30A/250V NEMA 6-30R (HVAC) 4 EA $___ $___
26 51 13 Recessed LED 2x4 Troffer, 40W 4000K 5000lm, 0-10V dim 36 EA $___ $___
26 51 13 Recessed LED 6" Downlight, 15W 3000K 1100lm, IC-rated 18 EA $___ $___
26 56 13 LED Wall Pack, 30W 5000K, photocell, bronze, wet-rated 6 EA $___ $___
26 55 33 LED Exit Sign w/ Emergency Heads, 90-min battery, red 8 EA $___ $___
26 05 26 Switch, Single Pole, 20A spec grade, ivory 18 EA $___ $___
26 05 26 Switch, 3-Way, 20A spec grade (corridors/stairs) 8 EA $___ $___
26 09 23 Occupancy Sensor, ceiling, dual-tech PIR+ultrasonic 6 EA $___ $___
26 24 16 Panelboard, 225A 208/120V 3ph 42-ckt, main lug 2 EA $___ $___
26 24 16 Panelboard, 100A 208/120V 1ph 24-ckt, main breaker 2 EA $___ $___
Division 26 Subtotal $___
Inclusions: All labor, materials, conduit, wire, boxes, devices, fixtures, testing per scope above. Includes branch circuit wiring from panel to device.
Exclusions: Fire alarm (Div 28), generator, ATS, low-voltage, data/telecom cabling, security, service entrance/transformer (by owner)
Alternates: ___
Lead Time: ___ weeks from NTP
Bid Valid For: 30 days
Division 22 — Plumbing Sub Bid Template — auto-populated from takeoff
CSI Item & Spec Qty Unit Unit Price Extended
22 42 13 Water Closet, floor-mount, 1.28 GPF, ADA height, flush valve 8 EA $___ $___
22 42 13 Water Closet, wall-hung, 1.28 GPF, w/ carrier, flush valve, ADA 4 EA $___ $___
22 42 16 Lavatory, wall-hung, 20"x18", vitreous china, ADA, P-trap 6 EA $___ $___
22 42 16 Lavatory, countertop, 19" round self-rimming, 4" faucet 4 EA $___ $___
22 42 43 Break Room Sink, 22"x25" SS single bowl, gooseneck faucet 3 EA $___ $___
22 42 43 Mop/Service Sink, 24"x24" floor-mount, molded stone, w/ vacuum breaker 2 EA $___ $___
22 41 13 Electric Water Heater, 50 gal, 4500W 240V, w/ expansion tank 2 EA $___ $___
22 13 16 Floor Drain, 4" CI w/ adj strainer, trap primer connection 6 EA $___ $___
22 14 13 Hose Bib, 3/4" frost-proof, anti-siphon 4 EA $___ $___
Division 22 Subtotal $___
Inclusions: Rough-in (waste, vent, water), trim-out, all fixtures listed above, valves, hangers, testing. Includes ADA grab bars at accessible fixtures.
Exclusions: Fire suppression (Div 21), gas piping, kitchen equipment connections, site utilities beyond 5' of building, water/sewer tap fees
Alternates: ___
Lead Time: ___ weeks from NTP
Bid Valid For: 30 days

In the live version, sub bid templates auto-populate from your takeoff data. Export as PDF or Excel. Subs can fill in unit prices and return to you in a standardized format for easy bid comparison.


What You Do Next

  1. Download the Excel — drop it into your estimating spreadsheet. Counts organized by CSI division.
  2. Verify the 2 flagged discrepancies — 3 doors not in schedule + fire rating mismatch. These could be RFIs.
  3. Apply your unit costs — quantities are the first pass. Your pricing and local knowledge finish the estimate.
  4. Send sub bid templates — export pre-filled bid forms to your subs with quantities already populated.
  5. Check compliance flags before permit — fix the egress width issue to avoid rejection at the building dept.